On-Site Space
Confirm dimensions, openings, equipment and personnel.

Engineering project
A complex multi-scene project covering training workshops, teaching buildings and a canteen. High-pressure cabinets and centrifugal fans extract workshop dust, while water-cooled fresh air units supply classroom fresh air. The high-pressure cabinets carry air over long duct runs, the centrifugal fans continuously extract training dust, and the fresh air units improve classroom temperature and humidity. Powerful, durable equipment withstands long high-load operation, with zones focused on dust extraction, fresh-air cooling and canteen fume control respectively.
Project overview
A complex multi-scene project covering training workshops, teaching buildings and a canteen. High-pressure cabinets and centrifugal fans extract workshop dust, while water-cooled fresh air units supply classroom fresh air. The high-pressure cabinets carry air over long duct runs, the centrifugal fans continuously extract training dust, and the fresh air units improve classroom temperature and humidity. Powerful, durable equipment withstands long high-load operation, with zones focused on dust extraction, fresh-air cooling and canteen fume control respectively.
Fresh air, exhaust and fume-extraction equipment configured for classrooms, canteens and activity venues, based on on-site space and operating duty.The case illustrates the approach; specific equipment and parameters follow actual project documents.
Project gallery



Project challenge
Confirm dimensions, openings, equipment and personnel.
Locate fume, oil mist, odor or heat sources.
Plan the direction of fresh air in and pollution out.
Check duct resistance, noise, energy and maintenance.

Our solution
Zone the equipment by teaching area, canteen and venues, balancing airflow, operating noise and long-term maintenance.
Products used

Low-noise, vibration-isolated air supply for quiet areas like classrooms.

Delivers cooled fresh air to relieve stuffiness and stale air.

High pressure for long canteen exhaust duct runs.
Project approach