On-Site Space
Confirm dimensions, openings, equipment and personnel.

Engineering project
A campus ventilation optimization that resolves classroom stuffiness, poor airflow and canteen fume spread. Silent cabinets paired with water-cooled fresh air units serve the teaching areas, and backward-curved cabinets handle canteen exhaust. The vibration-isolated silent cabinets suit plant rooms near classrooms, the fresh air units deliver cooled air to improve closed classrooms, and the backward-curved cabinets sustain high fume volumes. Galvanized sealed casings resist rust and moisture, and the system switches on and off by period with differentiated airflow.
Project overview
A campus ventilation optimization that resolves classroom stuffiness, poor airflow and canteen fume spread. Silent cabinets paired with water-cooled fresh air units serve the teaching areas, and backward-curved cabinets handle canteen exhaust. The vibration-isolated silent cabinets suit plant rooms near classrooms, the fresh air units deliver cooled air to improve closed classrooms, and the backward-curved cabinets sustain high fume volumes. Galvanized sealed casings resist rust and moisture, and the system switches on and off by period with differentiated airflow.
Fresh air, exhaust and fume-extraction equipment configured for classrooms, canteens and activity venues, based on on-site space and operating duty.The case illustrates the approach; specific equipment and parameters follow actual project documents.
Project gallery



Project challenge
Confirm dimensions, openings, equipment and personnel.
Locate fume, oil mist, odor or heat sources.
Plan the direction of fresh air in and pollution out.
Check duct resistance, noise, energy and maintenance.

Our solution
Zone the equipment by teaching area, canteen and venues, balancing airflow, operating noise and long-term maintenance.
Products used

Low-noise, vibration-isolated air supply for quiet areas like classrooms.

Delivers cooled fresh air to relieve stuffiness and stale air.

High pressure for long canteen exhaust duct runs.
Project approach