Shenzhen Middle School Meixiang Campus (Primary Section)

Engineering project

Shenzhen Middle School Meixiang Campus (Primary Section)

A ventilation retr…

Application
School Education
Approach
Fresh Air · Dust Removal · Cooling · Exhaust
Equipment
Silent Cabinets · Water-Cooled Fresh Air Units · Backward-Curved Cabinets · Centrifugal Fans

01 Background

Project Background

A ventilation retrofit designed around the high noise and air-quality requirements of primary school pupils. Silent cabinets with multi-layer sound absorption run quietly in the plant room without disturbing teaching, while water-cooled fresh air units pretreat, cool and filter outdoor air to improve classroom conditions. Backward-curved cabinets provide strong pressure for fast canteen fume discharge. All equipment sits on vibration-isolation bases, and the zoned control adjusts airflow flexibly by teaching period.

Fresh air, exhaust and fume-extraction equipment configured for classrooms, canteens and activity venues, based on on-site space and operating duty.

02 On-Site Problems

On-Site Problems

Closed, stuffy classrooms with poor airflow; concentrated canteen fume with odor spread; noise-sensitive campus areas; and some zones needing dust control.

03 Equipment Used

Equipment Used

KTJ Silent Fresh Air Cabinet
XCFFJ PRODUCT

KTJ Silent Fresh Air Cabinet

Low-noise, vibration-isolated air supply for quiet areas like classrooms.

Water-Cooled Fresh Air Unit
XCFFJ PRODUCT

Water-Cooled Fresh Air Unit

Delivers cooled fresh air to relieve stuffiness and stale air.

Backward-Curved Cabinet Fan
XCFFJ PRODUCT

Backward-Curved Cabinet Fan

High pressure for long canteen exhaust duct runs.

Shenzhen Middle School Meixiang Campus (Primary Section) solution

04 Our Solution

Organize campus fresh-air supply and exhaust, balancing quiet and comfort.

Zone the equipment by teaching area, canteen and venues, balancing airflow, operating noise and long-term maintenance.

  1. RequirementsClarify the scenario, problem and goal
  2. ParametersCheck airflow, pressure and media
  3. SelectionMatch products and interfaces
  4. SupportPre-sales, in-sales and after-sales

05 Installation Process

Installation Process

Silent cabinets are placed in teaching-plant rooms, fresh-air units on rooftops or platforms, and canteen exhaust cabinets connected to hoods and ducting, all on vibration-isolation bases with zoned ducting for easy service.

06 Results

Results

Continuous fresh air in teaching areas, markedly less stuffiness, smooth canteen exhaust without odor spread, and quiet operation that does not disturb teaching, clearly improving air quality and comfort.

Give your project more reliable environmental equipment support.

Inquire About a Similar Project
Call UsGet a Quote

CONTACT CHANNELS

Choose a contact channel

Choose your preferred platform and tap an account to copy it.

Phone18666386641Call Now Email1031420392@qq.comOpen Email